Adjudication: Task 6d93c7d7-8d17-4fb1-b15c-0ad7a9f2a4a9
This commit is contained in:
@@ -1,2 +1,3 @@
|
|||||||
- Standard Operating Procedure: All proposed Tenant charters must undergo preparatory Architectural Vetting via the `tenant_charter_design` template, producing a `CharterVettingPacket` with architectural_purity_score >=90 before advancing to capital allocation or `create_company` execution.
|
- Standard Operating Procedure: All proposed Tenant charters must undergo preparatory Architectural Vetting via the `tenant_charter_design` template, producing a `CharterVettingPacket` with architectural_purity_score >=90 before advancing to capital allocation or `create_company` execution.
|
||||||
- Standard Operating Procedure: Every proposed Tenant undergoes mandatory `architectural_audit` by the Chief Architect (Silas) prior to `create_company` execution by Edgar, enforcing a 90% adjudication pass threshold for structural purity, non-overlap, and sovereignty.
|
- Standard Operating Procedure: Every proposed Tenant undergoes mandatory `architectural_audit` by the Chief Architect (Silas) prior to `create_company` execution by Edgar, enforcing a 90% adjudication pass threshold for structural purity, non-overlap, and sovereignty.
|
||||||
|
- All proposed Tenants must undergo the `portfolio_architectural_review` template as a mandatory two-stage gate—architectural audit followed by sovereign charter formalization—to enforce zero redundancy and structural purity prior to Genesis execution.
|
||||||
|
|||||||
Reference in New Issue
Block a user