log: strategic review cycle {task.id}
This commit is contained in:
@@ -1,18 +1,18 @@
|
||||
## Cycle Entry: Task e7f07f15-393e-405f-bad2-50addf9e145d
|
||||
## Cycle Entry: Task 9a87ce9f-ca5e-47cd-ae92-4fd36fde7266
|
||||
|
||||
### Board Consensus
|
||||
The board acknowledged the technical failure of the `strategic_review` agent and determined that a template restoration is required to resume structural portfolio audits.
|
||||
The board acknowledged the persistent "template_load_failed" error blocking the 'strategy' template and determined that a manual restoration of the template directory within the Crimson Leaf repository is required to resume structural audits.
|
||||
|
||||
### Gap Status
|
||||
GAP 1 (CLO): awaiting David
|
||||
GAP 2 (CLR): deferred
|
||||
GAP 3 (KDP): deferred
|
||||
GAP 1 (CLO): No change
|
||||
GAP 2 (CLR): No change
|
||||
GAP 3 (KDP): No change
|
||||
|
||||
### Proposal Decision
|
||||
NONE: Portfolio-wide review was blocked by a missing system template in the company repository.
|
||||
DEFERRED: Technical block; strategic review and company creation cannot proceed until the 'strategy' template is restored to the crimson_leaf repository.
|
||||
|
||||
### CLM Dispatch
|
||||
NONE
|
||||
|
||||
### Next Focus
|
||||
Restore the 'strategy' template to the Crimson Leaf repository to enable formal board-level adjudication of the portfolio.
|
||||
The operator must manually move the 'strategy' template into the crimson_leaf repository to unblock the Genesis Protocol and allow for the formal chartering of new Tenants.
|
||||
Reference in New Issue
Block a user