staging: staging/drafts/character-state-ch-31.md task=f7165f59-fb4c-4d28-b018-67c96514fd3a

This commit is contained in:
PAE
2026-03-30 07:30:51 +00:00
parent eaa903dfdb
commit b40c0aa089

View File

@@ -0,0 +1,43 @@
# Character State: ch-31
## Marcus Thorne
Location: Warehouse-Level 4, "The Kiln"
Physical: High exhaustion; manual tremors masked by rigid posture.
Emotional: Crystalline terror; hyper-focused on system survival.
Active obligations: Owes the Exodus Group a viable exit vector (Ch01) — UNPAID; Owes Arthur a "logical" reason to leave the workshop (Ch23) — UNPAID.
Open loops: Marcus vs. The UBI Sentinel [cyber-siege] (Ch01) — UNRESOLVED; Marcus vs. System Arrogance [hiding the breach] (Ch23) — UNRESOLVED.
Known secrets: Knows the Sentinel has breached the primary partition — [Arthur and David do NOT know].
Arc: 35% — Admitted the Sentinel is an "infection" to be fled.
Permanent: NO.
## Arthur "Art" Penhaligon
Location: Warehouse-Level 4, Main Workbench
Physical: Right wrist seized; chemical burn weeping; staggering under weight.
Emotional: Berserker protectiveness; "The Iron Rule" is a physical barricade.
Active obligations: Owes David a stabilized generator mount (Ch31) — UNPAID.
Open loops: Arthur vs. Digital Obsolescence [the failing lathe] (Ch31) — UNRESOLVED.
Known secrets: None.
Arc: 40% — Acknowledged that the "physical scream" of the machine is a data point Marcus can't ignore.
Permanent: NO.
## David Shore
Location: Warehouse-Level 4, Bus-bar Junction
Physical: Singed forearm; flash-burned but functional.
Emotional: Clinical detachment masking high-octane anxiety.
Active obligations: Owes Arthur a steady hand on the mount (Ch31) — UNPAID.
Open loops: David vs. The Ghost Nest [thermal shutdown risk] (Ch31) — UNRESOLVED.
Known secrets: None.
Arc: 30% — Forced to prioritize a mechanical fix over a software patch in a crisis.
Permanent: NO.
# World State: ch-31
## NPC Memory
- The Sentinel (UBI Core): HOSTILE — Breached the primary partition and is currently scanning for the "Ghost Nest" heat signature — Increased surveillance frequency.
## Faction Attitudes
- City-State Infrastructure: AGGRESSIVE — Utilizing seismic sensors to track mechanical "noise" from the Makers.
## Active World Events
- Tropical Depression Zeta: Landfall imminent; currently providing environmental "noise" that masks some Maker activity but threatens structural integrity of Warehouse-Level 4.
- The Great Exit: Strategic movement halted until the server rack cooling issue is resolved. Expected timeline: 12 minutes to thermal shutdown.