log: strategic review cycle {task.id}

This commit is contained in:
PAE
2026-04-28 11:48:43 +00:00
parent 26be5c04c6
commit e21777a540

View File

@@ -1,18 +1,18 @@
## Cycle Entry: Task 7ca1fc3e-dc78-4ae2-b3a0-58d7024ffc4f
## Cycle Entry: Task 1c822655-1113-40c7-aa59-5e90feb98b1b
### Board Consensus
The board acknowledged the persistent `template_load_failed` error blocking formal portfolio assessments and reached consensus that manual repository maintenance is required before further incubation triggers can be processed.
The board acknowledged a persistent system failure regarding the missing 'strategy' template and determined that manual repository intervention is required before further incubation can proceed.
### Gap Status
GAP 1 (CLO): awaiting David
GAP 2 (CLR): no change
GAP 3 (KDP): no change
GAP 2 (CLR): deferred
GAP 3 (KDP): deferred
### Proposal Decision
DEFERRED: Systemic failure to load the "strategy" template prevents the architectural vetting required by the Genesis Protocol to approve new Tenants.
DEFERRED: Technical blocker prevents the execution of the strategic review workflow; 'strategy' template missing from crimson_leaf repo.
### CLM Dispatch
NONE
### Next Focus
The operator must manually restore or copy the `strategy.md` template into the `crimson_leaf` repository to unblock the Strategic Review engine and allow for portfolio-wide gap analysis.
The operator must manually restore the 'strategy.md' template to the crimson_leaf repository to enable the automated portfolio assessment and new company vetting.