1.1 KiB
1.1 KiB
- Standard Operating Procedure: All proposed Tenant charters must undergo preparatory Architectural Vetting via the
tenant_charter_designtemplate, producing aCharterVettingPacketwith architectural_purity_score >=90 before advancing to capital allocation orcreate_companyexecution. - Standard Operating Procedure: Every proposed Tenant undergoes mandatory
architectural_auditby the Chief Architect (Silas) prior tocreate_companyexecution by Edgar, enforcing a 90% adjudication pass threshold for structural purity, non-overlap, and sovereignty. - All proposed Tenants must undergo the
portfolio_architectural_reviewtemplate as a mandatory two-stage gate—architectural audit followed by sovereign charter formalization—to enforce zero redundancy and structural purity prior to Genesis execution. - Consolidate all redundant chartering templates (sovereign_tenant_charter, tenant_charter_drafting, tenant_charter_formalization, tenant_charter_standardization) into the single
tenant_charter_synthesisprotocol to enforce Zero Redundancy and Occam's Razor principles.