798 B
798 B
Cycle Entry: Task 7ca1fc3e-dc78-4ae2-b3a0-58d7024ffc4f
Board Consensus
The board acknowledged the persistent template_load_failed error blocking formal portfolio assessments and reached consensus that manual repository maintenance is required before further incubation triggers can be processed.
Gap Status
GAP 1 (CLO): awaiting David GAP 2 (CLR): no change GAP 3 (KDP): no change
Proposal Decision
DEFERRED: Systemic failure to load the "strategy" template prevents the architectural vetting required by the Genesis Protocol to approve new Tenants.
CLM Dispatch
NONE
Next Focus
The operator must manually restore or copy the strategy.md template into the crimson_leaf repository to unblock the Strategic Review engine and allow for portfolio-wide gap analysis.